Mumbai Faces 99-Hour Water Cut for Metro 7A Work; BMC Lists Affected Areas

Cities
N
News18•20-12-2025, 10:24
Mumbai Faces 99-Hour Water Cut for Metro 7A Work; BMC Lists Affected Areas
- •Mumbai to experience a 99-hour water supply disruption from December 22-26, 2025, due to Metro 7A project work.
- •The Brihanmumbai Municipal Corporation (BMC) announced the disruption, affecting G North, K East, and H East wards.
- •Key areas like Dharavi, Andheri, Bandra, and Bandra-Kurla Complex (BKC) will face low-pressure and altered water supply timings.
- •The disruption is for diverting a 2,400 mm diameter Upper Vaitarna main water pipeline for the Mumbai Metropolitan Region Development Authority (MMRDA) Metro 7A project.
- •BMC has appealed for public understanding during these critical infrastructure works.
Why It Matters: Mumbai residents to face 99-hour water disruption from Dec 22-26, 2025, due to Metro 7A work.
✦
More like this
Loading more articles...





