Metro Line 4 Advances with Overnight Steel Span Installation. (Photo Credit: Instagram)
N
News1802-02-2026, 18:51

Mumbai Metro Line 4 Bhandup: 100 Workers Finish Overnight Steel Span Installation

  • Mumbai Metro Line 4 achieved a major engineering breakthrough in Bhandup West with the successful installation of three massive steel spans.
  • The operation involved 100 skilled workers, 35 engineers, 70 traffic wardens, and 25 police personnel, completing the task in just two nights instead of the planned four.
  • Close coordination between MMRDA, BMC, BEST, traffic police, and utility teams ensured minimal disruption, with residents and shopkeepers informed in advance.
  • The 32.32-km elevated Metro Line 4 from Wadala to Kasarvadavali will have 30 stations, with an extension (Line 4A) to Gaimukh.
  • Expected to be completed by 2026, the line aims to cut travel time by 50-75% and connect with other major transport networks.

Why It Matters: Mumbai Metro Line 4 made significant progress in Bhandup with a swift overnight steel span installation.

More like this

Loading more articles...