पीपा पुल निर्माणकार्य जारी
Samastipur
N
News1801-01-2026, 16:11

Mahakumbh Artisans Build Lifeline: Samastipur Pontoon Bridge Ends Decades of Boat Dependence

  • Samastipur's Diara region, isolated by the Ganga River, relied on dangerous boat travel for decades, facing accidents and hardships.
  • A 1 km long, 20-meter wide pontoon bridge, costing ₹40 crore, is rapidly being built between Dharnipatti Purvi and Hardaspur Diara.
  • The bridge is constructed by experienced artisans from Prayagraj Mahakumbh Mela, using high-quality materials like SAIL iron.
  • Initiated by MLA Rajesh Kumar Singh and MP Nityanand Rai, the project, initially doubted, is now progressing with completion expected by March 2026.
  • It will transform daily life, easing transport for education, agriculture, healthcare, and business, fostering development and connectivity.

Why It Matters: Samastipur's new pontoon bridge, built by Mahakumbh artisans, ends decades of isolation, promising development and safe passage.

More like this

Loading more articles...