The 508-km high-speed rail corridor, being built between Sabarmati in Ahmedabad and Mumbai, is designed for trains running at speeds of up to 320 kmph
India
M
Moneycontrol01-01-2026, 15:10

India's First Bullet Train to Roll Out August 2027: Key Details Revealed

  • India's first bullet train is set to become operational by August 15, 2027, confirmed by Railway Minister Ashwini Vaishnaw.
  • Services will roll out in phases along the 508-km Mumbai–Ahmedabad High-Speed Rail Corridor, starting with Surat to Bilimora.
  • Trains will run at speeds up to 320 kmph, covering Mumbai-Ahmedabad in 1 hour 58 minutes (4 stops) or 2 hours 17 minutes (12 stops).
  • The inaugural 100 km run between Surat and Vapi is scheduled for August 2027, an increase from the earlier planned 50 km stretch.
  • Project faced delays from its original December 2023 target; PM Modi reviewed progress and suggested a 'Blue Book' for future projects.

Why It Matters: India's first bullet train on Mumbai-Ahmedabad route targets August 2027 launch with phased operations.

More like this

Loading more articles...