पांवटा साहिब–बल्‍लूपुर परियोजना हिमाचल प्रदेश से उत्तराखंड की बनेगी  कनेक्टिविटी
Dehradun
N
News1819-01-2026, 14:14

NH-07 Greenfield Bypass: Dehradun-Paonta Sahib Travel Time Slashed to 35 Mins

  • The 44.8 km four-lane NH-07 project connects Paonta Sahib to Dehradun (Ballupur), costing ₹1,646.21 crore.
  • A 25 km 'Greenfield Bypass' will alleviate urban congestion in Herbertpur, Sahaspur, and Selaqui, reducing travel time and accidents.
  • The project includes a 1,175-meter-long four-lane Yamuna River bridge and will facilitate access to Yamunotri.
  • The new highway reduces the route length by 7 km, saving fuel and improving road safety with its advanced four-lane design.
  • Divided into two packages, the project is targeted for completion by February 2026, cutting a 2-hour journey to 35 minutes.

Why It Matters: The NH-07 Greenfield Bypass will drastically cut travel time between Dehradun and Paonta Sahib to 35 minutes.

More like this

Loading more articles...