Bengaluru's 10-Lane Toll-Free Road: 1.5 Hrs to 10 Mins Travel, But Will Traffic Ease?

N
News18•14-02-2026, 13:50
Bengaluru's 10-Lane Toll-Free Road: 1.5 Hrs to 10 Mins Travel, But Will Traffic Ease?
- •Bengaluru's 10.76-km Major Arterial Road (MAR) is nearing completion, promising to cut travel time from 1.5 hours to 10 minutes.
- •The 10-lane, 100-meter-wide corridor will link Mysore Road and Magadi Road, eventually becoming part of the 54-km Peripheral Ring Road-1.
- •Despite its scale, traffic experts warn of potential pile-ups at connecting points due to narrower existing roads, like Magadi Road.
- •The project, initially estimated at Rs 465 crore, now stands at Rs 588.79 crore and is likely to be named after S.M. Krishna.
- •Solutions include diverting traffic via Seegehalli Road and a proposed cloverleaf interchange at Mysore Road for long-term relief.
✦
More like this
Loading more articles...





