Loading...
Kalyan-Taloja Metro 12 Work Progresses Rapidly, Offering Relief from Shilphata Traffic Jams: Key Update
LIVE TV
LOCAL
ENGLISH
For You
Entertainment
National
Sports
Markets
Business & Economy
Lifestyle
World
Astrology & Religion
Technology
Education & Jobs
Auto
Politics
Viral
Opinions
Loading more articles...
Home
Local
Live TV
Kalyan-Taloja Metro 12 Work Accelerates: 200th U-Girder Erected, Connectivity Boost
N
News18
•
21-02-2026, 15:06
Kalyan-Taloja Metro 12 Work Accelerates: 200th U-Girder Erected, Connectivity Boost
•
Metro Line 12 (Orange Line) work between Kalyan and Taloja is progressing rapidly, with the 200th 'U-girder' recently erected near Golavali station.
•
The 23.57 km corridor features 19 elevated stations, directly connecting Kalyan-Dombivli to Navi Mumbai and the proposed international airport.
•
This metro will significantly ease traffic congestion on the Kalyan-Shilphata route, offering relief to thousands of commuters.
•
Metro 12 will link with Metro Line 5 and Central Railway at Kalyan, Metro Line 14 at Hedutane, and Navi Mumbai Metro Line 2 at Amandoot station.
•
The elevated corridor, including a 7 km flyover, will drastically reduce travel time from Kalyan to Taloja, transforming the region.
Read Full Article on News18 in Marathi
✦
More like this
✦
More like this
Kalyan-Taloja Metro 12: Game-Changer for Traffic, 200th U-Girder Erected
N
News18
Kalyan-Shilphata Metro: 'Metro 12A' announced, connecting Dombivli to Navi Mumbai
N
News18
Dombivli Station Upgrade: Travel to be Smoother, Faster for Commuters
N
News18
Mumbai Metro 2B Project Accelerates: BKC-Kurla Traffic Woes to End Soon!
N
News18
Indore's AB Road Traffic Relief: 7 KM Elevated Corridor from LIG to Navalakha
N
News18
Eknath Shinde's Big Gift: Kalyan-Thane Transformation with Massive MMRDA Budget
N
News18